You can search our achievements in our database using the multi-criteria form below.
04/26/2009
Atlas cement works
Work on assembly of mechanical components and structural steelwork & manufacture of technical components of a cement works for Ciments de l’Atlas Tonnage: 20 000 000 tonnes Site: BENI MELLAL Work ...
03/02/2009
Piles
Operator: Chevron Site : Angola Tonnage : 190 tonnes Work implemented: steel cylinders over 10 meters high – design of 13 piles
02/26/2009
Manufacture of wind energy towers for Tangier:
Site : TANGIER Puissance : 140 MW Tower height: 65 m Number of towers: 165 Work implemented: Mak-out plan Manufacture of towers in compliance with the customer's A.F.C drawings Painting ...
02/26/2009
PLEM
Operator: Chevron Date of manufacture: 2009 Site: ANGOLA Tonnage: 500 tonnes Work implemented: frame + piping
02/26/2009
Extension of the Kirene cement works in Senegal
Site: SENEGAL / Kirène Tonnage: 2 000 tonnes Work implemented : Manufacture and assembly of heavy-duty components: main filter, raw mix hopper, additive crusher and ducts Assembly of structural ...
02/26/2009
Storage tanks
Storage tanks for Mohammedia power plant Site : MOHAMMEDIA Tonnage : 2 180 tonnes Work implemented: Manufacture and installation of the following storage tanks: Demineralized ...
12/26/2008
LAFARGE cement works Tetouan III
Site: Tetouan Tonnage: Work implemented: Crushing workshop and pre-homogenization workshop and linear stock Studies on buildings Supply and assembly of roof covering, building sheeting, ...
12/17/2008
Construction and assembly of an oil platform
Tonnage : 4 000 tonnes Constructed at: Ain Sebaâ workshops (Casablanca) Assembled at: Yard at Jorf Lasfar port Hours worked (manufacture and assembly): 450 000 hours (3x8) Number of employees working ...
02/26/2008
CIMAR cement works
Project: Manufacture and assembly of a baking line with dry process in a cement works for Ciments du Maroc (CIMAR) Site : AIT BAHA/AGADIR Tonnage : Work implemented: Manufacture Supply of ...
04/26/2007
Structural steelwork at Mohammed V Airport
Extension of the Mohammed V Airport – Terminal 2 Site : Casablanca Tonnage : Work implemented: structural steelwork
02/26/2007
Liquid ammonia storage tanks
Construction and assembly of 2 liquid ammonia storage tanks, double envelope and transfer circuits Customer : MAROC PHOSPHORE (Groupe OCP) Capacity: 36 000 m3 each, liquid ammonia at -33°C Dimensions: ...
01/26/2007
Risers Anchors
Operator: ESSO Exploration Site: ANGOLA Tonnage : 162 tonnes Work implemented: Manufacture of offshore equipment
02/26/2006
Manufacture of wind energy towers for Essaouira
Site: ESSAOUIRA-Cap Sim Date of manufacture: 2006 Power: 60 MW Tower height: 55 m Number of towers: 35 Work implemented: Mark-out plan Manufacture of towers in compliance with the customer's ...
02/26/2004
Lafarge cement works Tetouan II
Project: Supply and assembly for construction of the Lafarge cement works Tétouan II Site : TETOUAN Tonnage : Work implemented: Mechanical components Manufacture of flange and chute Cement ...
10/26/2003
Pumping station on the Afourer site
Project name: Construction of the energy transfer and pumping station on the Afourer site Site : AFOURER Tonnage : Work implemented: Manufacture, transport, assembly and painting Transport of ...
06/26/2003
Manufacture of wind energy towers
Customer: Compagnie Eolienne du Détroit (CED) Site: KOUDIA AL BAIDA, in the north of Morocco, to the south of the Straits of Gibraltar, between the towns of Tangier and Tetouan Power: 54 MW Length ...
07/17/2000
Fabrication of submerged storage vessel for gas diameter 6.3
Site: Mohammedia Tonnage: 660 T Hours worked: 25 243 hours Work implemented: Etude Génie civil Montage Peinture de réservoir immergé Equipements associés.
11/30/1997
Fabrication and Erection of Sulphuric Acid Unit
Site: JORF LASFAAR Tonnage: Work implemented: Exchanger gas/gas. Converter Absorption, heat and intermediate tower. Ducts.











07/17/2005
07/10/2004
07/27/2001
02/14/1996